MV Henry Larsen Alongside St. John's, NL
Deck Crane Removal
Mechanical Repair and Overhaul
Mechanical Repair and Overhaul
Load Test of Newly Overhauled Deck Crane
MARENER Industries NL was contracted to complete a multi-scope annual alongside refit on the CCG MV Henry Larsen. The scope of work included:...
Installation of Moon Pool Structures
Installation of Moon Pool Structures
Installation of Moon Pool Structures
Installation of Moon Pool Structures
Installation of Moon Pool Structures
Installation of Moon Pool Structures
MARENER Industries was contracted to perform the fabrication and installation of a moon pool structure from the main deck to the underwater hull...
Engineered Fendering System - Deltaport, BC
Engineered Fendering System - Deltaport, BC
Engineered Fendering System - Deltaport, BC
Engineered Fendering System - Deltaport, BC
Engineered Fendering System - Deltaport, BC
Engineered Fendering System - Deltaport, BC
MARENER Engineered Systems was contracted to supply twenty-five (25) engineered fender systems in conjunction with the construction of Berth 3 at...
Engineered PMF System - Tsawwassen Berth 4
Engineered PMF System - Tsawwassen Berth 4
Engineered PMF System - Tsawwassen Berth 4
Engineered PMF System - Tsawwassen Berth 4
Engineered PMF System - Tsawwassen Berth 4
MARENER Engineered Systems was contracted to provide nine (9) QuayQuip design-built Parallel Movement Fendering (PMF) Systems during for the major...
Overhaul of the Stern Ramp
Overhaul of the Stern Ramp
Overhaul of the Stern Ramp
Removal of the Crank Shaft
Reinstallation of the Crank Shaft
Reinstallation of the Overhauled Stern Ramp
MARENER Industries was contracted to overhaul the 142 tonne stern ramp and replace the main engine crank shaft on the MV ASL Sanderling...
Damaged Hydraulic Towing Arms
Removal of the Hydraulic Towing Arms
Onsite Repair of the Towing Arms
Onsite Repair of the Towing Arms
Onsite Repair of the Towing Arms
Load Testing of the Reinstalled Towing Arms
MARENER Industries was the primary contractor for the removal, repair and reinstallation of the deck mounted hydraulic towing arms on both the MV...
PRV Launch for Premlimary Sea Trials
Construction of the Aluminum Hull Skeletons
Mechanical and Electrical Outfitting
PRV Launch for Premlimary Sea Trials
Sea Trials of a Completed PRV
Completed PRVs Ready to Delivery
MARENER Industries was contracted by Publics Works and Government Services Canada (PWGSC) as part of the Government of Canada's 2010 ...
Agile 1
Agile 2
Agile 3
Agile 4
MARENER Industries was the primary contractor for conversion of the MV Agile from a 140-meter cable-laying vessel to a subsea pipe-laying vessel....
MV Grenfell Alongside St. John's, NL
MV Grenfell Alongside St. John's, NL
Mechanical Overhauls - MV Grenfell
Mechanical Overhauls - MV Grenfell
Mechanical Overhauls - MV Grenfell
MARENER Industries NL was contracted to complete a multi-scope alongside refit on the CCG MV Grenfell. The scope of work included electrical...